After the dryer completes the drying task, it is sent to the 2# horizontal system through the plate extraction machine to complete the fixed length edge cutting of the gypsum board, and then sent down the finished product conveyor to check the quality and distinguish stacking. After the stacking is completed, the forklift is transported to the packaging area for secondary inspection and packaging, and the whole production process is completed.